top of page

Building Project -- Phase 2

Bethel Lodge: 40 Bunk Dormitory with Kitchen and Laundry Room

Construction on the Foundation of Bethel Lodge To Begin In April of 2025

Bethel Lodge Exterior 3D.jpg

Preparation of Building Site

Bethel Lodge Exterior 2D.jpg
Bethel Lodge Floor Plan 1st Floor.jpg
Bethel Lodge Floor Plan 2nd Floor.jpg
Bethel Lodge Location and Position.jpg
bottom of page